Quarried Materials
Natural aggregates | $ per tonne | Bulk density tonne / m3 |
GAP7 |
46.50 | 1.44 |
GAP20 | 46.50 |
1.44 |
ATAP 40 | 33.18 | 1.60 |
ATAP 65 | 32.72 | 1.60 |
NZTA M/4 AP40 Basecourse | 45.54 | 1.74 |
Non spec 40 | 30.00 | 1.60 |
Non spec 65 | 30.00 | 1.60 |
Drainage Chip 20/40 | 51.75 | |
F2 Sand | 69.38 | |
No.3 Sand | 52.23 | 0.85 |
Scoria 25/7 | 69.86 | 1.10 |
Scoria Sap 7 | 55.06 | 1.20 |
Plant Mix Asphalt | 355.00 |
Recycled Alternatives
Recycled Aggregates | $ per tonne | Bulk density tonne / m3 |
RCC10 | 32.00 | 1.46 |
RCC20 | 29.50 | 1.46 |
RCC40** | 23.18 | 1.46 |
RCC65** | 22.72 | 1.46 |
Basalt 40 | 23.50 | 1.60 |
Basalt 65 | 23.00 | 1.60 |
Rec Drainage Chip | 15.00 | 1.60 |
* RCC - Recycled Crushed Concrete
**ATAP 0800 spec
Recoverable materials (clean concrete steel free & basalt) * Account holders only
Type | $ disposal cost per load |
Skip bin 3m (max 4.5 tonne) | Free |
4 Wheeler Sml | Free |
4 Wheeler Lge | Free |
6 Wheeler | Free |
8 Wheeler | Free |
Artic Trailer | Free |
Truck & Trailer | Free |
Non-recoverable materials (mixed loads includes $10.00 per tonne waste levy)
Type | $ disposal cost per load |
Skip bin 3m (max 4.5 tonne) | 154.00 |
4 Wheeler Sml | 171.00 |
4 Wheeler Lge | 275.00 |
6 Wheeler | 330.00 |
8 Wheeler | 447.00 |
Artic load | 602.00 |
Truck & Trailer | 904.00 |
Concrete with steel reinforcing
Type | $ per tonne |
Material free of contaminants & asbestos (Minimum 10 tonne) | 22.50 |
Terms & Conditions
Price list effective from the 1st of July 2023 - prices exclude GST.
Products and Pricing is reviewed periodically and subject to change without notice.
Purchase is subject to Downer NZ General Terms of Contract.
Conversions are approximate only.
Product Data sheets are available upon request.
Clean concrete is deemed to be soil free.
Green Vision Recycling can only accept natural materials such as clay, soil, rock, concrete, brick, ceramics, tiles, roading aggregates, cured asphalt or mixtures of any of the above.
All clean fill shall be in dry condition.
Material classification to be determined by GVR staff.
Please note due to heavy equipment operating on the Green Vision site there is no public access to drop off or collect materials.
Note 1: Loads with pieces of steel reinforced concrete larger than 400mm square are subject to 20% surcharge
Note 2: Loads with rocks larger than 500mm square are subject to a 20% surcharge
Note 3: GAP40 & 65 (Non spec) by special order only.
Note 4 : Please refer to the Green Vision Waste Acceptance Critera before delivery of spoil
Note 5 : The landfill waste levy information can be found at https://environment.govt.nz/wh...